Work Day 1 - March 7

Because we have so much work to do, we are really trying to push hard to get it all done so we can move in sometime in April. We got a lot done this first day. Uncle Dave came over and spent the day helping tear up the kitchen and bathroom floor. He also helped lay the subfloor. My dad came and started working on all the electrical, which is a mess, downstairs. A few friends came over and helped also. They knocked down some of the sheetrock in the basement, starting tearing off the lava rock around the garage, and helped out wherever they could. We felt it was a very productive day!
Here are pictures of the kitchen after the floor was ripped up.
Here is the bathroom after the floor was ripped up.
Laying the subfloor.
This is where they knocked out the sheetrock. It was full of holes and really old so we thought it would be best if we just started from scratch. As you can see, the electrical is a mess. Wires everywhere. My dad said it's one big fire hazard! So his first project is to rip out all the old wiring and start from scratch. Thanks dad!

No comments:

Post a Comment